Build Over Sewer / Storm Water Booking form.

IC Pipes would like to make the process of obtaining a quotation for your “Build Over” CCTV inspection Dilapidation Report easy. Our rate is listed below if you simply upload your information below one of our friendly staff members will be in contact to confirm your preferred time and date is available.

arrow&v
arrow&v

Booking Details

Upload File
Upload file (Max 3MB)
Upload File
Upload file (Max 3MB)
Upload File
Upload file (Max 3MB)
Upload File
Upload file (Max 3MB)

Upload documents:  PDF (Optional)

Upload File
Upload file (Max 3MB)
Upload File
Upload file (Max 3MB)
  • Standard Rate for Build Over, General Condition Inspection and Da Approval CCTV cost is $780.00 + GSTper visit. This cost I based on one sometime 2 lines from the same location.

  • Package work is generally quoted please provide as much detail as possible for IC Pipes to provide accurate pricing.

  • We will require the organizer to arrange permission to access to either the nearest upstream or downstream manhole/Pit/Access chamber on the time allocated to conduct the work.

  • IC Pipes will send 2 technicians with the latest in CCTV Technology and provide the required CCTV Reporting to the WSA codes of condition evaluation reporting criteria.

  • Standard Hourly rate is $220.00 per hour Depot to Depot Monday to Friday 7am to 330pm Night shift and after hours $280.00 per hour Depot to Depot, Stand down may apply for nonconsecutive nightshifts.

Upload images:  jpeg, png, jpg. (Optional)

Asset Owner, Water Authority or Council.

© 2016 Copyright IC Pipes Pty Ltd

Terms & Conditions

45001-safety-icon.png
9001-quality-icon.png